Technical details

Explanatory notes

The complex is designed for year-round servicing of the population for the purpose of holding sports competitions in ice hockey, figure skating, and other ice disciplines, as well as holding mass cultural and entertainment events, scientific and public meetings and congresses, exhibitions and presentations.

The projected building of the Ice Sports Arena is planned to be located on a land plot of at least 7.5 hectares. The projected object is a three-part complex with dimensions in the plan of 135x130m.:

  • The first part is a 3-storey facility with dimensions of 130x35x8 (h)m (entry section).
  • The second part – three large-span, single-storey with a mezzanine blocked with each other volume dimensions of 130x65x24(h)m., the basis of which is two rinks size 30x60m., and a large skating area dimensions 40x80m.
  • The third part is a 2-storey volume with dimensions of 130x35x8 (h) m. (Economic and technical section)

The building of the complex is a capital structure and is built on reinforced concrete foundations with a basement. The construction arrangement of the complex is made of a metal frame. The structures of the three large-span coverings of the building are completely made of wooden structures of the "glued laminated lumber" type. The outer perimeter is insulated with sandwich panels; the translucent part is decorated with reflective blinds. The roof is soft, galvanized profiled flooring, wooden crate with insulation with expanded polystyrene boards. Windows: triple-pane window.

Lobby, ticket offices, skate rental, WC, shops, food court and entrance nodes are located on the first floor of the building from the main entrance.
Restaurant, guest rooms, VIP-lounges, a mezzanine with spectator seats with access to the roof.

Administration building, chiller plant, transformer sub-station, 2 garages, auxiliary rooms, depots, stage with dressing and utility rooms are located at the back side of the building.

In the central part of the complex there are: 2 rinks at 2 sides of the complex, sized 30x60m, lock room with showers and WC for 12 teams for two rinks, stands, a skating area for mass skating in the central part, sized 40x80m, utility rooms.

The surface of the skating rink is made of synthetic ice. Insulation 100mm thick is directly applied to the hard surface of the asphalt. Ground heating pipes are located under the insulation.

On one part of the plot there is a territory with one-storey villas for VIP-guests, a restaurant, baths, an open veranda for banquets, houses for staff and a parking lot. An open parking lot (500-700 car spaces) is designed in front of the building of the sports complex.

The improvement project and the organization of the relief were developed in conjunction with the altitudes of the existing asphalt pavement around the complex. Organizing drainage from the site, a natural slope towards the local passage was used.
The area in front of the building, the sidewalks are made of colored paving stones.
Outdoor lamps such as floor lamps, benches, flower beds, waste bins, small architectural forms are planned to install.
The landscaping project involves planting new trees and shrubs in groups and hedges on the site, as well as flower beds and lawns.

Technical and economic performance

01
Plot area - 75 000 sq.m.
02
Building area - 18 500 sq.m.
03
Total building area - 30 600 sq.m.
04
3 Ice arenas - 9 000 sq.m.
05
Hotel - 7 000 sq.m.
06
Lobby with retail space - 3 000 sq.m.
07
Foodcourt - 3 000 sq.m.
08
Restaurant - 1 200 sq.m.
09
Outdoor pool under a canopy - 2 400 sq.m.
10
Technical and service premises - 5 000 sq.m.
11
Maximum capacity (total) - 20 000 people

Economic indicators of the project

Foreign investments - more than 60 000 000 EURO
Construction period – 14 months
Jobs - more than 300
Salary fund - more than 9 000 000 $ / year.
Income - more than 25 000 000 $ / year
Expenses - 18 000 000 $ / year
Taxes - 27% of net profit or more than 2 000 000 $ / year.
More than 200 sports, mass, entertainment and exhibition events per year

Technical and economic indicators of the project

Information concerning the object's demand for fuel, gas, water and electricity
Estimated capacity of the refrigeration unit
Kw
640,0
Total estimated capacity of the facility
Kw
985,0
Total estimated power
Kw
1 525,0
Estimated power of the UPS
Kw
180,0
Water supply B0
M3/day/
M3.hour/l/s
30,02/34,54/14,42
sec during fire l/s
Water supply B1
M3/day/
M3.hour/l/s
12,38/16,16/8,97
Water supply T3
M3/day/
M3.hour/l/s
16,66/18,50/10,04
Sewerage K1
M3/hour/l/s
30,02/18,02
Sewerage K2
l/s
62
Gas consumption (heating)
gCal/hour
0,200539
Gas consumption (ventilation)
gCal/hour
0,874189
Gas consumption (hot water supply)
gCal/hour
0,1105500
Gas consumption (technological needs)
gCal/hour
0,390175
Estimated capacity of the building
Indoor skating rink during training sessions capacity
Person/shift
400
Indoor skating rink during competitions capacity
Person/shift
200 (8 teams of 25)
Duration of the shift
Hour/ min
1,5/45
Number of the shifts
Hour/ min
8/24